Skip to main content
    Home renovation in Western North Carolina

    Refine What's There.

    Protect What Matters.

    Renovation isn't demolition. It's the discipline of improving what exists while preserving what works — structure, character, and the investment you've already made.

    Avg. ROI: 60–80% at resale

    Quick answer

    What does a home renovation include?

    A renovation reworks existing space — kitchens, baths, living areas, or whole-home updates — without necessarily expanding the footprint. Scope can range from finishes to structural changes, mechanical updates, and improved insulation or daylighting. Highlander renovates homes and cabins throughout Western North Carolina.

    • Kitchen, bath, and whole-home scopes
    • Structural and mechanical changes where needed
    • Single team managing the full schedule

    Renovation isn't about tearing things apart. It's the discipline of improving what exists while preserving what works — structure, character, and the investment you've already made.

    Highlander approaches renovation the way we approach every project: with documented scope, defined materials, honest timelines, and the same crews and project managers who build our additions and install our roofs. The result is renovation work that feels intentional — not improvised.

    Why Renovate

    The Real Reasons Homeowners Renovate.

    Not every renovation is about aesthetics. Most start with a functional problem that's gone unaddressed too long.

    Improve How It Functions

    Kitchens that don't work for how you cook. Bathrooms that fight you every morning. Layouts that waste space. Renovation starts with fixing what doesn't serve you anymore.

    Update What's Worn

    Outdated finishes, failing fixtures, and materials past their lifespan. Some renovations aren't about style — they're about replacing components that are no longer performing.

    Address Hidden Problems

    Water damage behind tile, insufficient insulation, outdated wiring, failing subfloors. Often the most important renovation work is what you can't see until demo day.

    Protect Long-Term Value

    A well-executed renovation increases your home's value, reduces maintenance costs, and extends the life of your largest asset. Done poorly, it does the opposite.

    Renovation Services

    What We Renovate.

    Kitchen Remodels

    Complete kitchen transformations — layout reconfiguration, cabinetry, countertops, plumbing, electrical, and finish work. Designed for how you actually cook and live, not just how it photographs.

    Bathroom Renovations

    Master baths, guest baths, and powder rooms — tile work, vanities, plumbing relocation, ventilation upgrades, and waterproofing that prevents the hidden moisture damage we see constantly in WNC homes.

    Living Space Transformations

    Open-concept conversions, room reconfigurations, built-in cabinetry, and living area upgrades that change how your home flows and functions without adding square footage.

    Basement Finishing

    Converting unfinished basements into functional living space — framing, insulation, moisture management, electrical, plumbing, and finish work. Critical in WNC where basement moisture is a constant consideration.

    Structural Modifications

    Load-bearing wall removal, floor leveling, foundation repairs, and structural reinforcement. We involve a structural engineer on every modification that touches the home's skeleton.

    Whole-Home Renovations

    Coordinated multi-room or full-home renovation projects managed as a single scope — ensuring trades don't conflict, timelines stay integrated, and finishes are consistent throughout.

    Finish Quality

    The Details You Live With Every Day.

    Renovation quality isn't about the big reveal — it's about what you notice six months later. Grout lines. Trim joints. How a drawer closes. We build for the long view.

    Tile & Stone

    Precise layout planning, consistent grout lines, proper waterproofing layers, and substrate preparation. Tile work that looks right in year one and stays right in year ten.

    Cabinetry & Millwork

    Plumb, level, and aligned — with consistent reveals, soft-close hardware, and finish carpentry that holds up to daily use. We don't accept gaps, misalignment, or shortcuts.

    Material Transitions

    Where flooring changes, where trim meets tile, where old wall meets new — these transition points define whether a renovation looks professional or improvised.

    Paint & Surface Prep

    Proper prep, proper primer, proper technique. Smooth walls, clean edges, and finish coats that last. Paint quality is directly proportional to preparation quality.

    Our Process

    Renovation, Systematized.

    01

    On-Site Assessment

    We walk your home, discuss your goals, and identify structural, mechanical, and aesthetic considerations that will shape the scope.

    02

    Design & Scope Development

    Detailed scope of work with material selections, layout options, and a fixed price. You see exactly what you're getting before work begins.

    03

    Permitting & Preparation

    We handle all permitting, trade coordination, and material procurement so you're not managing logistics.

    04

    Material Sourcing & Scheduling

    Materials ordered, delivery coordinated, and your project locked into the production calendar with a defined start date.

    05

    Execution

    Professional renovation with daily quality checks, clean work zones, dust barriers, and proactive communication throughout.

    06

    Walk-Through & Completion

    Final review, touch-ups, cleanup, and documentation. Your home, refined.

    Ready to discuss your renovation?

    We respond rapidly with a direct call — not a form email.

    Why Highlander

    Renovation With Roofing-Grade Standards.

    Our heritage in high-elevation roofing built our construction discipline. The same documented process, the same in-house crews, the same material standards — now applied to every renovation we accept.

    Same Planning Discipline

    We scope renovation work with the same detail and documentation we bring to roofing — written proposals, material specifications, defined timelines, and no vague allowances.

    Same Quality Standards

    Our renovation crews are held to the same quality checkpoints, material handling standards, and supervision protocols as our roofing and construction teams.

    Same In-House Crews

    The same trained, employed craftsmen who build our additions and install our roofs handle renovation work.

    Same Attention to Detail

    Trim reveals, caulk lines, material transitions, and tile work matter. We treat visible details as quality indicators — because you'll notice them every day.

    Documented Everything

    Written scope, transparent cost groupings, specified materials, confirmed timeline. You receive a complete proposal — not an estimate with vague allowances and vague 'to be determined' items.

    WNC Material Knowledge

    Mountain humidity, temperature swings, and elevation affect material performance. We specify products rated for WNC conditions — not what's cheapest at the supply house.

    Recent Work

    Renovation Projects.

    Each project was scoped, documented, and executed with the same discipline we bring to every build.

    Kitchen renovation in WNC home

    Kitchen Remodel

    Complete Transformation, Asheville

    Bathroom renovation with custom tile

    Master Bath

    Custom Tile & Vanity, Sylva

    Living space open concept renovation

    Open Concept Conversion

    Wall Removal & Refinish, Franklin

    Whole home multi-room renovation

    Whole-Home Renovation

    Multi-Room Scope, Fairview

    VELUX Certified Installer

    Add Daylight to Your Remodel

    Browse the VELUX skylight and Sun Tunnel lineup for renovations — then tell us which rooms you want brightened.

    Luke Smith, Owner & Founder at Highlander Building Services

    Luke Smith

    Owner & Founder

    Kristy Smith, Owner & Financial Manager at Highlander Building Services

    Kristy Smith

    Owner & Financial Manager

    Local People. Local Accountability.

    Who shows up at your property.

    Highlander Building Services is owned and operated by Luke and Kristy Smith. Every project gets a single named point of contact from inspection through completion — backed by Western NC-based crews and a Franklin office that answers the phone.

    One named contact

    Same person from quote to final walkthrough.

    Western NC crews

    Based in Franklin, not a traveling subcontractor network.

    Owner-led

    Luke and Kristy set the standards the team follows.

    Where You Are Right Now

    Pick the next step that fits

    Some people need someone on the roof this week. Others are six months out and still gathering information. Both are welcome — start wherever you actually are.

    Ready now

    Get eyes on it and a number in writing

    On-site look, photo documentation, and a written scope you can compare line by line.

    • 4.8★ Google · 158 reviews
    • Licensed and insured
    • Crews based in Franklin, serving Western North Carolina
    • NC GC #87668

      Licensed NC General Contractor · fully insured

    • Family-owned in Franklin since 2017

      Showrooms in Franklin & Sylva

    • 4.8★ · 158 Google reviews (as of September 2026)

      Google Business Profile reviews

    • 19 WNC towns served

      Across 10 mountain counties

    • Recent: Metal Roofing

      Highlands, NC · 3,200 sq ft roof replacement

    Renovation FAQs

    Common Questions.

    We handle kitchen remodels, bathroom renovations, basement finishing, open-concept conversions, structural modifications, and whole-home renovation projects. We focus on work that involves structural, plumbing, or electrical systems — not cosmetic painting or flooring-only projects.

    A full kitchen remodel typically takes 6–10 weeks depending on scope. Layout changes, plumbing relocation, and custom cabinetry add time. We provide a specific timeline during the proposal phase and update you weekly on progress.

    In most cases, yes — with some inconvenience. Kitchen renovations are the most disruptive. We'll discuss staging, temporary solutions, and phasing options during planning to minimize daily-life impact.

    It's common — especially in older WNC homes. When we find hidden water damage, outdated wiring, or structural issues behind walls, we stop, document, discuss scope and cost with you, and proceed only after approval. No surprise charges.

    We manage the construction scope, including layout and material recommendations. For complex design work, we collaborate with local project planners and designers and manage the construction coordination so you don't have to.

    A written scope with transparent cost groupings, material specifications, timeline, and payment schedule. Every element is defined before work begins — no vague allowances or vague 'to be determined' items.

    Dust barriers, floor protection, dedicated entry/exit routes for crews, and daily cleanup are standard. We treat the non-renovation areas of your home with the same care we'd want in our own.

    Yes. Many mountain homes built before 2000 have unique framing methods, non-standard electrical, plaster instead of drywall, and moisture issues specific to elevation and terrain. We assess these factors before scoping work.

    Design & Consultation Agreement

    Serious Renovations Start With a Design Phase.

    Whole-home and multi-room renovations need a coordinated plan, not decisions made on the fly. Our paid Design & Consultation Agreement scopes, draws, and documents the renovation before construction pricing is finalized.

    Three design phases
    Permit set + construction documents
    Design fees can credit toward your build
    Get My Plans Drawn
    • Phase 1
      Discovery & Scope

      Site review, goals, constraints, and a written scope of work. We define what the project really is — before anyone draws or prices it.

    • Phase 2
      Plans, 3D Views & Material Direction

      Our in-house design team produces layouts, 3D views, and material direction so you can see, refine, and approve the build before it starts.

    • Phase 3
      Permit Set & Construction Documents

      Permit-ready drawings and construction documents your crew can actually build from — and your county will actually approve.

    Timeline Expectations

    How long this actually takes

    Construction runs on a slower clock than a roof repair, and pretending otherwise helps nobody. Here is the realistic pace of a Highlander project in Western North Carolina.

    1. Week 1

      Consultation

      A working conversation about goals, constraints, and feasibility — on site where it matters. No pressure to commit.

    2. Weeks 2–6

      Planning and design

      Existing conditions measured, concepts developed, scope written down. Length depends on how much design the project needs.

    3. Varies by county

      Permitting and scheduling

      Applications submitted, materials ordered, and your project placed on the production calendar with a confirmed start.

    4. Scope dependent

      Construction

      Daily oversight, milestone checkpoints, and proactive communication when weather or conditions change the sequence.

    5. Final week

      Walkthrough and closeout

      Punch list resolved, site restored, documentation handed over, and a final walkthrough before we call it done.

    Budget Context

    Where your project likely lands

    We don't publish a price per square foot for renovations — it would be a guess, and guesses cost homeowners money. Instead, here is how we talk about scope and what actually drives the number, so the first consultation starts from a realistic place.

    Focused scope

    A single room, a detail-level upgrade, or one exterior element. Shortest planning cycle and the fewest trades on site.

    Mid scope

    A porch, a modest addition, or a significant renovation. Design coordination, permitting, and multiple trades in sequence.

    Large scope

    Multi-room work, a guest suite, or structural changes. Engineering input, longer lead times, phased scheduling.

    Estate level

    Whole-home or complex builds. Full design documentation, long procurement windows, and a dedicated project schedule.

    What moves the budget

    Site and access

    Slope, driveway access, and staging room change labor hours more than most homeowners expect in Western North Carolina.

    Structural work

    Foundations, load changes, and engineering review move a project into a different planning and cost tier.

    Finish level

    Materials and detailing carry a wide range. The same footprint can land in very different places depending on selections.

    Permitting and design

    Drawings, county review, and inspection sequencing add real calendar time and belong in the budget conversation early.

    Talk through your budget range with a project advisor
    Cost Transparency

    What actually drives renovation cost here

    We do not publish a headline price, because a number pulled off a chart is not an estimate — and in Western North Carolina, two properties on the same street can price very differently. What we can do is show you every variable that moves the number, then put a written scope in your hands.

    Size, layout, and structure

    Square footage matters less than what the structure has to do. Load-bearing changes, roof tie-ins, and foundation work drive far more cost than added floor area.

    Site access

    Narrow gravel drives, steep grades, and tight tree lines change how materials get staged and how debris comes off the property — sometimes by hand instead of by truck.

    Finish level

    The same footprint can double in price between builder-grade and custom millwork, tile, and cabinetry. Selections are where budgets move most.

    Site and terrain

    Mountain lots bring grade changes, rock, drainage, and septic and well constraints. Sitework is priced from what the lot actually is, not an average.

    Permits and existing conditions

    County review, engineering when required, and whatever we find behind older walls — wiring, plumbing, framing — are scoped honestly rather than buried in an allowance.

    What your written estimate includes

    • On-site walkthrough with measurements and photo documentation
    • Line-item scope by phase: sitework, structure, envelope, mechanicals, finishes
    • Named selections and allowances stated in dollars, not vague placeholders
    • What is excluded, spelled out, so bids can be compared honestly
    • Projected schedule with the sequencing and inspection points behind it

    Want a real number?

    Tell us what you are planning and where. We walk the property with you, talk through the variables above, and put a written phase-by-phase scope in your hands before anyone commits.

    Straight Answers

    Common concerns, answered straight

    The five questions we hear most often — and exactly what we do about each one.

    "I don't know what this will cost."

    We measure your roof on site and send a written, grouped-cost scope that names materials, quantities, and labor line by line. You see what drives the number before you decide anything, and nothing is added later without a signed change order.

    "I don't want to fight my insurance company."

    We document the damage with dated photos and a written condition report you can submit with your claim, and we can meet the adjuster on site so everyone is reading the same roof. We do not decide your claim, but we make sure the evidence is complete and the scope language is clear.

    "Contractors always run behind."

    Mountain weather moves schedules, so we build the calendar around real weather windows and tell you the plan in writing before materials are ordered. If a date shifts, you hear it from your project contact the same day rather than finding out from an empty driveway.

    "Who is actually showing up at my house?"

    Our crews are Franklin-based and led by a foreman you meet before work starts, not a rotating pool of day labor. You get one named point of contact for the whole project and daily progress updates while the crew is on your property.

    "I'll be cleaning up nails for a year."

    We tarp landscaping and staging areas, keep debris moving to the dumpster through the day, and run magnetic sweeps of the drive and lawn before we leave each evening. The final walkthrough is done with you, and anything you spot gets handled before we call it complete.

    Start Planning

    Your Home Deserves Better Than 'Good Enough.'

    Whether it's a kitchen that finally works, a bathroom that lasts, or a whole-home renovation done right — let's have a straightforward conversation about what's possible.

    • 4.8★ Google · 158 reviews
    • Licensed & insured · family-owned since 2017
    • Franklin-based crews across 9 WNC counties